M2 AND THE PLASSO

Education

Facilitate the creation of an innovative space allowing collaboration between staff and students.

Scope of Works:

The M2 building at the University of South Australia’s Mawson Lakes campus was to be designed to facilitate engagement between student, researchers and industry stakeholders through creating a series of flexible and open spaces which stimulated innovation.


Project Successes:

O’Connors successfully:

  • Co-ordinated the drafting and construction of the intensive building services packages
  • Installed all mechanical services systems including 100% outdoor air units with heat exchangers, providing conditioned air to the occupied spaces through a mix of active chilled beams, fabric ducting, underfloor and more traditional air distribution systems.
  • Energy efficiency was maximised through the use of evaporative pre-cooling pads for the air-cooled chillers, high efficiency condensing boilers, and the provision of variable speed drives throughout to allow fan and pump losses to be minimised. Additional laboratory systems provided included specialist gases, fume cupboards, corrosive and flammable store ventilation ducting, bench-top fume extraction systems and oxygen depletion monitoring.
  • Commissioned and certified a Cell Therapy clean room suite with complex pressurisation regimes
  • Targeted a 5-star “As-Built” rating under the Green Star – Education v1 rating tool.

Latest News

O'Connors - Top 100 South Australian Companies

The list is a demonstration of the top performing companies for the year and celebration of the the state’s leaders and high achievers across sectors, and in a range of categories.

Telstra, Waymouth Street New Data Centre

O'Connors and Broadspectrum have worked closely with Telstra to design & construct cooling to new racks for a Telstra expansion.

O'Connors + BIM-MEP Construction Innovation Forum

BIM-MEP Australia is an offshoot of the AMCA developing national standards, processes and libraries of parts to use in BIM. O’Connors are actively involved in this initiative.

Adelaide Convention Centre - Stage 2 Completion

Our construction and commissioning team successfully completed stage 2; handover to the client was in July and the first events took place in August. The entire project (stage 1+2) is a testament to the whole O'Connors team.